▲ TOP

Call for 2025A SPring-8 Research Proposals – Overview –

[Contents]

  1. 2025A User Operation
  2. Requirements
  3. Fees (Tax Included)
  4. List of Beamline Summaries
  5. Contact

1. 2025A User Operation

1.1 Beamtime Available to Users and Period of Research in 2025A

1.1.1 Beamtime Available to Users

 261 beamtime shifts for 2025A
  Please note that it is subject to change with the situation of the electricity supply.

1.1.2 Period of Research (tentative)

 [At Beamlines with biannual calls for proposals]

 2025A Term: From early April to late July 2025

 [At Beamlines with sixannual calls for proposals*]

 2025A-I Term : From early April to elate April 2025
 2025A-II Term : From mid-May to late June 2025
 2025A-III Term : From late June to late July 2025

* Beamlines with Sixannual Calls are BL01B1, BL02B1, BL02B2, BL09XU, BL13XU, BL14B2, BL16XU, BL19B2, and BL46XU.

1.2 Types of Research and Proposals Available for 2025A Beamtime and Online Submission Deadline for Proposals (Japan Time)

[Types of Research]

There are two types of research available at SPring-8: proprietary and non-proprietary research. Users are exempt from paying the beamtime fee if their research is non-proprietary. For research to be considered non-proprietary, users are required to make their research results available to the public through refereed journals or equivalent. For proprietary research, the research proposals are reviewed only from the viewpoint of feasibility, safety, sociality, and ethics. In this type of research, users are charged a beamtime fee of 480,000 yen/shift based on cost recovery for SPring-8 beamline operation. In return, users are not required to make their research results publicly available.

If you are a doctoral student (at the time of experiment) and wish to apply for beamtime (submit a proposal as a project leader), the Graduate Student Proposal or Long-Term Graduate Student Proposal are your only choice; as a project team member, you can participate in any research project.

[Types of Proposals Available for 2025A Beamtime]

Proprietary Research

Type of ProposalDescriptionsFrequency for call
Proprietary ProposalFor general research using synchrotron radiation, with no obligation to publish results and a simplified review process. A beamtime fee will be charged.Twice/six times a year
SPring-8 Measurement Service (Reg.)JASRI staff will perform measurements on behalf of users, and users simply send their samples to SPring-8.six times a year
SPring-8 Measurement ServiceThe proposal can be applied at any time, and will be examined immediately after application submitted. JASRI staff will perform measurements on behalf of users, and users simply send their samples to SPring-8.as needed
Proprietary Time-Designated Proposal (Beamtime use by shift-based or hour-based)The proposal can be applied at any time, and will be examined immediately after application submitted. The hour-based use proposal program, provides users in the early stages of their research with a convenient opportunity to use SPring-8 to confirm the usefulness or to examine measurement conditions. It can also be used to obtain additional data after the experiment.as needed

Non-proprietary Research

Type of ProposalDescriptionsFrequency for call
General ProposalFor general research using synchrotron radiation, with obligation to publish results. Twice/six times a year
Graduate Student ProposalIntended for doctoral students (at the time of experiment) with an exploratory and original research proposal or research theme. Twice/six times a year
Non-Proprietary Priority ProposalIntended for the proposals subject to pay the program fee to prioritize using the beamtime. The users also have obligation to publish their research results. Under the program, the proposals will be granted an exemption from scientific review; only the safety and technical feasibility of the experiment, and ethics (e.g., exclusively for peaceful purposes) are considered. One-year proposals are accepted for research term A.twice/six times a year
Once a year for One-year Proposal

  • Proprietary Proposals, Non-Proprietary Priority Proposals, Measurement Service Proposals: November 13, 2024, 10:00 am
     A signed Agreement must be received before November 20, 2024.
  • General Proposals, Graduate Student Proposals: December 5, 2024, 10:00 am
     A signed Agreement for Graduate Student Proposal must be received before December 12, 2024.

1.3 Beamlines Available for 2025A Public Beamtime

Beamlines available for 2025A public beamtime by type of proposal are indicated in Table 2.

Table 2. Beamlines Available for 2025A Beamtime by Type of Proposal (PDF)

For the specifications and status of experimental stations, please check the Beamline List and Table 3. List of Beamline Summaries.

1.4 Several Bunch Mode Operation in 2025A

The several bunch modes scheduled for 2025A are as follows:

  • A-mode: 203 bunches
  • B-mode: 4-bunch train x 84
  • C-mode: 11-bunch train x 29
  • D-mode*: 1/7-filling + 5 bunches
  • E-mode*: 2/29-filling + 26 bunches
  • H-mode: 406 × 11/29−bunches + 1 bunch

Please note that there may be a possibility that the operation in above Bunch Mode cannot be provided depending on the Accelerator Status.

* The filling modes of D- and E-modes are operated only in research term A (e.g. 2025A, 2026A). In research term B (e.g. 2025B, 2026B), the F-mode (1/14-filling + 12 bunches) and the G-mode (4/58-filling + 53 bunches) will be operated instead of the D- and E-modes. For details, click here.

If you have a preference for a particular operating mode, choose from the pull-down menu on the Basic Information page of the online application form, and explain the difference in efficiency between your first- and other modes in the box provided for “Others.”

1.5 Beamtime Allocation at BL15XU

From the 2025A term (specifically, from the second period), some beamtimes will be available for public use at BL15XU of RIKEN Beamline. Only proposals that can be conducted with the High Energy Laminography will be accepted for 2025A. For technical specifications of the beamlines, please refer to “Beamline List” and “List of Beamline Summaries.”

1.6 Beamtime Allocation at BL39XU

Due to equipment installment/adjustment, 21 shifts at BL39XU are subducted from 2025A Beamtime.

1.7 Reconstruction Work at BL40XU

Due to reconstruction works, BL40XU will have no user time in the 2025A term. Proposals for SAXS/WAXS research are available at BL05XU.

1.8 Regular Calls for Measurement Service Proposals

The regular call for Measurement Service Proposals will begin in the 2025A term at the specific Beamlines: BL14B2, BL19B2, BL28B2, and BL46XU. The schedule is the same as the Beamlines with sixannual calls. For details, please click here. We also continue to accept applications on a rolling basis.

1.9 Revision of Fees

For details, please refer to “3. Fees”.

1.10 Sample Preparation Service (chargeable)

Sample preparation service (charged on a pay-as-you-go basis) for XAFS pellet preparation (BL01B1, BL14B2) and powder capillary filling (BL02B2, BL13XU) will be available from the 2025A term. Please contact the Beamline Scientist for consultation to use this service.

1.11 Quasi-Proprietary Use for Non-Proprietary Priority Proposals

From the 2025A term, Non-Proprietary Priority Proposals will offer quasi-proprietary use to applicants affiliated with industrial institutions.

2. Requirements

2.1 User Registration (Not Required of Repeat Users)

To submit an application online, you must have obtained a user account (user card ID number and password) by registering yourself. Please make sure that not only project leaders/applicants but also all project team members are registered as SPring-8 users. If you are not registered as a SPring-8 user, click here to register.

Note: Registration information is also used for contact. If any of your registration information changes, you must update it from the UI site.

    Top Page > My Page Login > Account Information > Edit My Details & SPRUC Research Groups

2.2 Application for Beamtime

Applicants/project leaders are required to submit proposals online from the User Information website (UI site) through the web-based proposal submission system.

Log in to the system with your user card ID number and password. If you have not obtained your user card ID number, please complete user registration first. Please note that only the project leaders can submit proposals. Before starting the application process, project leaders must make sure that all project team members have completed user registration.

To avoid losing work in the event of a browser crash or unexpected logout, you are strongly encouraged to first draft your application offline using the MS Word template available from here.

For step-by-step instructions on how to submit proposals, click here.

Upon successful submission, you will receive a confirmation email attached with a copy of the Agreement (Rules for Users) in PDF format. If you do not receive confirmation within a reasonable time, please login to the proposal system and check if your proposal has been submitted.

[Important Notes]

a. Project Leader

A project leader is the person who will have overall responsibility throughout the experiment at SPring-8. The project leader and the person who is responsible for the research may not be the same person. Likewise, the project leader need not be the first author for SPring-8-related publications.

b. Application Type (New/One-Year (accepted for A terms only))

If you wish to apply for a one-year proposal, which (a) is applicable only for Non-proprietary Priority Proposals, (b) may allow you to use beamtime in two consecutive research terms (starting in A terms and ending in B terms), and (c) is applicable only in A terms (no call for B terms), choose One-Year as Application Type.

c. Use of Multiple Beamlines

Applicants wishing to use more than one beamline must submit a separate application for each beamline. Submitting multiple applications is not detrimental to applicants if it is deemed appropriate to use more than one beamline. In such a case, applicants may use the same wording in the abstract page of the applications.

d. Number of Shifts Required (8 h/shift)

Generally, beamtime is allocated in increments of 3 shifts; however, the minimum allocatable beamtime is 0.25 shifts for BL41XU and BL45XU, 1 shift for BL26B1, and 1.5 shifts (or 0.25 shifts for Automatic Data Collection without a visit) for BL32XU. Similarly, the minimum allocatable machine-time is 3 shifts for CryoTEM. If you need assistance in calculating how many shifts are necessary for your research, please contact the Beamline Scientist.

e. List of SPring-8 Publications (Repeat Users Only)

List the project leader’s publication (maximum 3) associated with the proposed research (Place an asterisk next to the publications based on research at the SPring-8.) and describe each publication briefly. In addition, register the project leader’s ORCID iD at MyPage, Account Information, if available. (ORCID iD will be used to understand the project leader’s past research activities which is not directly related to the proposed research.)

f. High Pressure Gas Cylinder

If you wish to bring in a high-pressure gas cylinder, please make sure to provide all required information in the online application:
[Known Safety Hazards & Measures to Be Taken]
“Does your proposed research involve any of the following?” > Check the box for “High pressure gas cylinder.” Then, fill out the “Details of samples” table properly. Please be advised that if you attempt to bring in a high-pressure gas cylinder without providing the required information in the application, there may be restrictions on the cylinder to be brought into the site during the administrative procedures required by the High Pressure Gas Safety Act.

g. Mode Operation

For details on options for Mode Operations, please click here.

2.3 Radiation Worker Registration

Japanese Law (Ordinance on Prevention of Ionizing Radiation Hazards) requires SPring-8 users, excluding non-visiting users using Measurement Service/PX-BL Automatic Data Collection, to be registered as SPring-8 radiation workers. To complete your registration, you must submit a “Radiation Worker Registration Form (Form 5-1)” by post at least 10 days before your visit. Once registered, submission of this form is not required for return visits within the same fiscal year (from April 1 to March 31 of the following year). For details, click here.

2.4 Others

  • – Safety Precaution
    For your safety, do not work alone. Please include the name of your project team members in the online proposal application and make sure to work in a group of two or more.
  • – Cancellation of Beamtime
    Please be advised that your scheduled beamtime may be cancelled in case of emergencies such as equipment failure, natural disaster, and pandemic. In such cases, users cannot claim compensation for the lost beamtime.
  • – General Insurance and Compensation
    Users shall take out appropriate personal injury and liability insurance before conducting experiments. If their project teams include students, they shall make sure that all the students take out appropriate personal injury and liability insurance. If users damage SPring-8 facilities, equipment or persons, either willfully or through gross negligence, JASRI may require them to meet all or part of the cost of repairs. JASRI shall take due account of all relevant circumstances in determining the degree of user liability.
  • – Helium Supply (both liquid and gas)
    Please note that there is a possibility that JASRI cannot provide stable supply of Helium (both liquid and gas) due to the recent situation regarding global helium supply.

3. Fees (Tax Included)

Please also refer to the “Fees for Beamline Use for Proposals” webpage summarizing fees for public beamline use and user fees.

3.1 Beamtime Fee

[Non-proprietary Research]

Type of feePer shift*
Beamtime feeUsers are exempt from paying the fee

Note: For research to be considered non-proprietary, users are required to disseminate their research results through refereed journals or equivalent and register the results with the SPring-8 Publications Database within three years from the end of the half-year research term. For details, click here.

[Proprietary Research]

Regular Use

Type of feePer shift*
Beamtime fee480,000 yen

Time-Designated Use

Type of feePer shift*
Beamtime fee + Time-Designated Use fee720,000 yen

N.B. Beamtime Fees of CryoTEMs for regular and time-designated use are 80,000 yen/shift (8 hours) and 120,000 yen/shift (8 hours), respectively.

Measurement Service

This fee will apply if you use the Measurement Service by applying for regular calls, six times a year.

Type of feePer shift*
Beamtime fee + Measurement Service fee720,000 yen

Measurement Service with Time-Designated Use

This fee will apply if you use the Measurement Service, not according to regular calls.

Type of feePer shift*
Beamtime fee + Time-Designated Use fee + Measurement Service fee960,000 yen

3.2 Program Fee for Non-Proprietary Priority Proposal

Non-Proprietary Priority Proposals are exempt from scientific review, and only the technical feasibility and the safety of the experiment and ethics (e.g. exclusively for peaceful purposes) are reviewed and are available on the payment of program fee.
For any proposals that are allocated by the hour, the beamtime fee is charged by the hour.

Type of feePer shift*
Program fee for non-proprietary Priority proposal144,000 yen

N.B. Beamtime Fee of CryoTEMs for Non-Proprietary Priority Proposal is 22,000 yen/shift (8 hours).

3.3 Program Fee for Quasi-Proprietary Use

When you apply for the Quasi-Proprietary Use for a Non-Proprietary Priority Proposal, the following fee will be charged in addition to the fee described in 3.2 above (only when approved).

Type of feePer shift*
Quasi-Proprietary Use fee144,000 yen

3.4 User Fees

Public beamline users, including CryoTEM users, are required to pay the fees to cover the costs of beamline maintenance/operation and consumables actually used (user fees). User fees are composed of a fixed fee charged for wear and tear on the facility and a variable fee charged for liquid Helium.

Fixed Fee

Type of feePer shift*
User fee (fixed)12,400 yen

Variable Fee

  • A variable fee will be calculated and added in accordance with the amount of liquid helium / sample preparation service actually used.

* 1 shift is 8 hours and for any proposals that are allocated by the hour, the fees are charged by the hour.

Important: We will cover the costs for Graduate Student Proposals and Long Term Graduate Student Proposals from domestic universities within the budget. Please note that the variable fee is not always covered when it exceeds the limit of the budget.
Click here for more details.

4. List of Beamline Summaries

Research areas and experimental stations/facilities available to users at each beamline are listed below. For the specifications and status of experimental stations, please also refer to the Beamline List. If you have questions, please contact the Beamline Scientist.
Table 3. List of Beamline Summaries

5. Contact

ContactPhoneE-mail address
SPring-8/SACLA Users Office/JASRI+81-791-58-0961sp8jasri@spring8.or.jp